The entire building has been pulled back to its bare bones, showing off the tall open ceilings above and a general renovation performed on all mechanical, electrical and plumbing systems.High end kitchen with a food preparation area added to the building. The main dining and drinking area can fit 150 comfortably, and there’s a separate casual takeaway coffee and pastry option at the end of the building as well.
MEP Project Scope: Provided plumbing layout for cold water, hot water, sewer and vent for the kitchen. Provided exhaust, make up air to the new hood. Provided Grease Interceptor Design and Layout. Air Conditioning System and Ductwork Layout for the kitchen and dining area. Power Layout for kitchen equipment and Lighting Layout Design.